Skip to content

Critical Infrastructure Inspection

Powerline Inspection

Structure-by-structure inspection of distribution and sub-transmission lines — poles, crossarms, insulators, hardware, equipment and clearances — with every finding located, photographed and classified for your maintenance planners.

Lattice transmission tower and conductors over farmland

The challenge

Thousands of structures, limited crews

Distribution systems are made of a very large number of similar structures spread across urban, rural and wooded terrain. Ground patrols see the bottom of the pole well and the top of it poorly; climbing or bucket inspections are slow and require outages or traffic control.

The defects that cause outages and safety incidents — cracked insulators, damaged crossarms, loose or corroded hardware, failing cutouts, bird and animal damage — are typically at the top of the structure, where a camera positioned above or beside the hardware sees far more than an observer at ground level.

  • Top-of-pole hardware not visible from the ground
  • Backlogs of structures overdue for inspection
  • Storm damage assessments needed before crews can be dispatched safely
  • Inconsistent condition data across contractors and years

Our approach

Inspection designed for maintenance planning

Structure imagery

A defined set of photos per structure — top, each side, hardware and equipment — so every pole is documented the same way.

Defect classification

Findings classified with your utility’s defect codes and priority levels, or with a standard scheme agreed at kickoff.

Equipment inventory

Transformers, reclosers, switches, capacitor banks and attachments identified and recorded with location.

Clearance screening

Vegetation and object proximity flagged for follow-up; measured clearances available with LiDAR.

Thermal option

Infrared capture of connections and equipment under load to detect abnormal heating.

Storm assessment

Rapid damage documentation after weather events to support safe and prioritized restoration.

Deliverables

What you receive

  • Photo set per structure, named with structure ID
  • Findings register with defect code, priority and photo reference
  • Equipment inventory updates
  • Map layers of structures and findings
  • Segment summary and recommended work

Standards context

Aligned with utility practice

Inspection criteria are aligned with your utility’s maintenance standards and the clearance and strength requirements your engineers apply under the National Electrical Safety Code (NESC). Flights near energized lines follow FAA Part 107 rules, the utility’s safety requirements and minimum approach distances established in the safety plan.

How a powerline project runs

  1. Scope Circuits, structure counts, defect codes, priority definitions and photo standards.
  2. Plan Flight plans per circuit, access, landowner notification and airspace review.
  3. Capture Structure-by-structure imagery with in-field coverage checks.
  4. Review Every structure reviewed by an analyst; findings classified and located.
  5. Deliver Findings to your work management system or the Geospatial Platform.

Frequently asked questions

Can you use our defect codes?

Yes. Using your existing codes and priorities makes the findings directly usable by planners and avoids re-classification.

Is an outage required?

Aerial inspection is performed without de-energizing the line, from distances defined in the safety plan.

How is this different from transmission inspection?

Distribution inspection focuses on high structure counts and equipment; transmission inspection adds larger structures, longer spans and engineering-grade clearance analysis.

Related

Vegetation Monitoring

Clearance measurement and encroachment detection along lines.

Powerline inspection methods

Knowledge Center comparison of ground, aerial, LiDAR and thermal methods.

Thermal Inspection

Infrared surveys of connections and equipment under load.

Discuss your project with Vector

Tell us about the assets, the area and the decisions the data must support. Our technical team will reply with scope options and next steps.